ClimateRight CR-2550 Manuale del Proprietario Pagina 198

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 197
Equipment Operation
6-55
Gray Water System
The gray water system option consists of a 6 gallon holding tank along
with a deck mounted waste pump out tting. Water from a cockpit
refreshment center or head sink normally exits the boat at a thru hull
tting. With the gray water system any used potable water is stored via
the drain hoses to a holding tank. Once the gray water holding tank is
full it is pumped overboard by a pumping station vacuum pump much
the same way a toilet holding tank is pumped out.
This system is environmentally friendly as it keeps many soap related
alkalines and harsh detergents out of the water supply.
Equipment Operation
6-55
Gray Water System
The gray water system option consists of a 6 gallon holding tank along
with a deck mounted waste pump out tting. Water from a cockpit
refreshment center or head sink normally exits the boat at a thru hull
tting. With the gray water system any used potable water is stored via
the drain hoses to a holding tank. Once the gray water holding tank is
full it is pumped overboard by a pumping station vacuum pump much
the same way a toilet holding tank is pumped out.
This system is environmentally friendly as it keeps many soap related
alkalines and harsh detergents out of the water supply.
Vedere la pagina 197
1 2 ... 193 194 195 196 197 198 199 200 201 202 203 ... 348 349

Commenti su questo manuale

Nessun commento